Archive for January 2009
You are browsing the archives of 2009 January.
You are browsing the archives of 2009 January.
Tried my hand at making card weaving tablets.
I used dogwood due to its strength, and ripped it down to ~ 1/16″.
I then drilled a template block. In the 1/4″ holes I placed dowel centers so I could make exact marks in the dogwood cards.
I then took them to the drill press to drill the holes, then singed [...]
I had a blast this weekend.
I went into the dusty depths of my wood-shop on Saturday morning, and didn’t come out till Sunday 6pm. (sleeping eating and biffy breaks excluded).
The very best thing of all, I now have the dust extraction lines/hoses established at all my major dust making tools. It was amazing the difference [...]
I managed to get all the wood ripped to the right widths. Taking the time to build a proper jig for the table saw helped out loads.
I assembled the pieces only to discover that I didn’t cut the seat board bevels quite short enough. They are all sitting around an inch out of flat. [...]
Not really a very good update, but I just had to share the photo’s of the pretty wood.
I have ripped all my reddish wood to 3/4″. The pieces are a little bowed still so I will be needing to make a jig to rip the edges down straight. I could have done it before on [...]
I will be using for my x-chair.
It stalled out my tablesaw 6 times to do the one rip.
It also ended up tapering the begining and end to the plank…doh
Just means more work for the mortising holes.
picture doesn’t do the color justice.
On a related note… does anyone dye with wood sawdust? I got me a bunch [...]
More progress on the x-chair front.
After pulling all the nails out of the skid runners, I moved on to
ripping the runners into 3/4″ x 3″ planks.
My tablesaw got one hell of a work out ripping these boards to size.
The wood is incredibly hard, and after only 2 runners I decided to stop.
My shop was filling [...]
I decided to clean up the shop this weekend.
Spent a good portion of Saturday cleaning the work bench and table saw top off, and freeing up some much needed floor space. I then decided to finally install my dust extraction system. I decided to place all the 2.5″ piping along the ceiling as the wall [...]